Skip to content
MiletusDigital Solutions Engineering
T-02

Measurement plan

Puts in writing what a job is measured by, where the data comes from, and which threshold counts as acceptance.

Filled in before the build, so the acceptance measure is in writing up front.

  1. 01

    The quantity to measure

    Define it in one sentence; everyone must read it the same way.

  2. 02

    Source

    Which system, which screen, who enters it.

  3. 03

    Cadence

    How often it is measured, and who looks.

  4. 04

    Acceptance threshold

    Above or below which value it is accepted.

  5. 05

    What happens if the threshold isn't met

    Who it goes to, and what is done.

miletusdigital.com · blank template